silhouette rope access cleaning

Rope Technician & Access Solutions

We have long standing experience in different forms of access to help projects be completed in the most cost effective, but above all the safest way.

Our fitters are trained in various disciplines and include:

  • IRATA (Industrial Rope Access Trade Association) – Our rope technicians are trained to the standards to ensure that they operate safely. We currently employ Level 1, 2 and 3 technicians.
  • PASMA (Prefabricated Access Suppliers and Manufacturers Association) – This gives our operatives the training to understand how to build mobile alloy access towers safely.
  • IPAF (Internation Powered Access Federation) – Our operatives are trained to operate mobile elevating work platforms including 1b static boom, 3a mobile vertical and 3b mobile boom.
  • Static Lift Supervisors – Our site managers have undertaken static lift supervisor training for one of the largest construction companies in the UK.

You may also be interested in...

silhouette rope access cleaning

Get a free site survey





*Required

Could you also thank the guys who replaced the windows as I didn’t get the chance to thank them myself.  They did a brilliant job

Abu Zakaria, Scope – London

Fortunately I had a structural survey locally [to site] last week and popped by the site and the workmanship looks good.  I know LCN are happy [with the works].  Thanks for the update.

David Edgson, Cadtec Engineering – Marsh Wall, London

The Glazing Face have provided a professional service with all works meeting required H&S requirements of site.  Good communication throughout work with prompt responses to any queries or issues that popped up as they tend to. I would recommend using and would use The Glazing Face again myself.

John Martin, Lambert Smith Hampton – 1 Eversholt Street, London

The Glazing Face carried out substantial repairs to our shopping centre glass roof and installed a safety access system.  I give them the following marks out of 10. Overall quality of product or commission  -  8.5, Overall quality of service - 8.5, Defects at the time of delivery or completion -  8.5, Completion of contract to agreed cost - 9, Contract completed to agreed time - 8, Safety  - 9 Would you use The Glazing Face again?   - Yes - 100%

Braehead Shopping Centre, Glasgow

Thank you very much for the hassle free and professional replacement of the glass in our atrium.  Please thank the team for being so efficient and completing the job to a very high standard.  Due to your installation techniques and flexibility, the business was unaffected, for which I am extremely grateful

Jamie Thornton, SS Solicitors, Exeter

I am writing to say a huge thank you for the excellent work you & your team carried out here at Autodesk.  The equipment was fantastic & what seemed to be a very complicated job with huge levels of risk really was carried out gracefully

Kate Commerford – AutoDesk, Farnborough

Good news! To date, we seem to have combatted the issue from the roofline, so I thank you all for your persistence in solving this for us, it’s very much appreciated.  Will you thank your team for me, they were all great to work with!

Beth Byrne – MDIS, Birkenhead

The Glazing Face have been awarded the contract to carry out remedial repair and alteration works to a 5 storey high profile commercial building situated on the riverside outside to Temple Meads train station. The tenants of the building are Burges Salmon who are a reputable law practice who insist on high quality workmanship. As this project was a legacy project, we employed The Glazing Face due to their specialist expertise in this field. In meeting TGF team, they gave an immediate positive reaction to the works, and were not fazed by the extent of the works ahead of them.

John Richards, Balfour Beatty – Project: Glass Wharf, Bristol